Dredging is essential to the construction and maintenance of maritime projects for navigation, ports, land reclamation, and offshore energy exploitation.
Defining the need for a dredging project
The decision to initiate a dredging project is a complicated process. It involves the client assessing a need, and then seeking input from regulatory agencies, contractors and stakeholders to develop a plan to implement the project.
Early Contractor Involvement
Early Contractor Involvement (ECI) provides an efficient means of designing and planning infrastructure projects in a cost-effective, efficient and cooperative structure, which increases transparency and shared responsibilities, reducing risks and reasons for disputes.
Financing
Financing a dredging project usually occurs through a lending institution that will require a preliminary design with the project concept, preparation, detailed engineering, construction, operational targets and environmental measures.
Site investigation
Site investigations are a first step in the accurate preparation to define the design of the project, the type of equipment needed and to limit problems arising from unforeseen conditions.
Procurement
The procurement process begins with developing prequalification criteria for contractors, as well as tender and bidding documents, the issuance of tender documents by the client, and then the review of tenders by the client and consulting engineers employed by the client.
Contract
Contracts for dredging projects can take many forms depending on the size and type of project. Alliance contracts, public-private partnerships and traditional contracts as developed by FIDIC (International Federation of Consulting Engineers) are amongst the forms of contract available.
Planning
The complexity of planning a dredging project should not be underestimated. Assessing the need, considering alternatives, acquiring adequate scientific and environmental data and being aware of permitting and other regulations is part of the process to develop an integrated plan.
Borrow area selection
Borrow area selection for reclamation and beach restoration projects is an important part of project planning as a good borrow area affects the feasibility of a project. It defines the amount of available, suitable fill at a reasonable distance from the site, it determines the type of equipment that will be used and it will have a financial impact on the project.
Equipment selection
The selection of equipment is one of the most important considerations in a dredging project and depends on the type of material being dredged and location of the project. The appropriate equipment will be cost-effective and environmentally sound.
Design phases
The design of a dredging project goes through several phases – a preliminary design, a more detailed design, a final construction design, and maintenance. A rational design will integrate functional and performance requirements taking into account boundary conditions, equipment and working methods.
Construction phase
The construction phase requires creating detailed specifications for the contract documents; soliciting and awarding tenders; establishing an administration structure and inspection scheme; and establishing monitoring parameters for during construction.
Operation and maintenance phase
The operation and maintenance phase of the dredging project begins once construction has been completed. Operations and maintenance are recurring works that will ensure that the project functions properly for as long as possible.
Monitoring
Monitoring is often stipulated in a dredging contract and part of permitting regulations. It will occur before works start to establish a baseline for the dredging site, continue during construction, and often be required for a specified time period after completion of the dredging works.
Maintenance (after completion of the project)
Once a dredging operation has been completed, maintaining the site is of great importance to ensure that the initial investment remains intact and functions as planned.
Subjects
From Concept to Contract to Completion
- Borrow Area Selection
- Choice of Type of Dredger
- Design Phases of a Project
- Design of a Reclamation Area
- Financing
- Identification of Stakeholders
- Maintenance (after completion of the project)
- Planning
- Preliminary Planning and Design
- Project Management
- Systems Engineering
- Types of Dredging Projects
- Work Plan for Reclamation Projects
related
Articles
Applying early contractor involvement in marine infrastructure procurement
Complex construction projects that use traditional procurement practices are often impacted by significant cost overruns and delays. Early contractor involvement (ECI) is a concept that strives to involve the contractor collaboratively at an early stage of a project’s development to mitigate or otherwise eliminate those risks. In August 2022, PIANC published the report “A framework for early contractor involvement in infrastructure projects” to help industry practitioners in choosing and best implementing ECI. This article is intended to develop on key aspects of the PIANC report and look at the factors that can lead to a successful maritime ECI project.
Deploying private capital to accelerate the green transition
Green solutions in ports, waterways and coastal projects have increasingly become available thanks to many years of research and pioneering efforts in practice. These sustainable and/or nature-based solutions have shown to be good alternatives for classic solutions, but application is far from mainstream yet. One of the major hurdles is the lack of access of private capital to finance these kinds of solutions despite the strong interest of capital markets in green infrastructure opportunities. Identifying the hurdles and paving a way forward to overcome these hurdles could therefore help to increase the uptake of those green solutions.