Registration open for the Seminar on Dredging & Reclamation in Delft: 1-5 July 2024
Learn the basics of dredging from experienced lecturers and complete a tender process from start to finish!
Registration open for the Seminar on Dredging & Reclamation in Delft: 3-7 July 2023
Learn the basics of dredging from experienced lecturers and complete a tender process from start to finish!
Register now for the live 5-day Seminar on Dredging & Reclamation in Delft
Learn the basics of dredging from experienced lecturers and complete a tender process from start to finish!
Fact Sheet: Beneficial Use of Dredged Material
The new IADC-CEDA Fact Sheet "Beneficial Use of Dredged Material" is now available in the IADC Knowledge Centre.
Vertical or Wick Drains
Prefabricated vertical drains (PVDs) or Wick drains are applied in areas where loose, compressible, water-saturated soils make the soil unstable.
Underwater Placement in Bulk of Fill Material
Underwater placement of fill is usually performed by trailing suction hopper dredgers and barges by opening their bottom doors or by split hull vessels.
Subsea Rock Installation
Subsea rock installation is a technique used for rock placement to protect marine infrastructure, especially for offshore oil, gas and wind energy projects.
Soil Improvement
Soil improvement is applied to both consolidate existing loose subsoils and sometimes specifically for compaction of newly reclaimed soil.